WeBuild Global · 4145 Old Dobbins Bridge Rd · Scenario B

Dobbins Plant Walkthrough

Existing 93 x 43 building plus a 43 x 70 tilt-up on the east end; the walk-out garage sits under the west end with its doors on the back wall, reached only by the driveway from the west. Roads around the site from OpenStreetMap. Walls and machines are solid: you walk through doors, not walls.

Plan view

Drag to look, double-click to walk

Drag anywhere to look around (or use the pad below). WASD move · double-click locks the mouse for free look · Shift run · Esc releases

Walls, machines and racks are solid. Go outside through any door: the ground drops to the garage doors around the west end.

T next stop · L labels · G garage level · F fly (then Q/E down/up)

Follow worker and Truck arrival: drag to swing the camera, wheel to change the distance.

LOOK / ORBIT
Free walk

Pick Guided tour to step through the flow of a sheet of plywood, Follow worker to watch someone walk it station to station, or Truck arrival to come onto the site the way a delivery does.